LoadSwift produces bespoke solutions for projects globally. The image galleries show a selection of our solutions.
AF Gruppen ASA - Oslo - Norwegian Tax Office renovationAn NOK 150 million project to renovate the Norwegian Tax Office including facade and interior. The basement has to be fully protected during the works and the whole building is covered in plastic sheeting to prevent water ingress. 15 rolling platforms were provided as the best solution to getting material in and out of the building whilst allowing the integrity of the waterproofing to be maintained.
Australia - Brisbane - Devine Condo projectHi Rise multiple tower project on the Brisbane River at Hamilton. 3.3 m rolling platforms with bespoke ramp systems to cater for different floor sections
Australia - Brisbane - Lend Lease Supreme Court building$100 m + development of new Brisbane Supreme court. 3.3 and 4.2 m wide rolling platforms with bespoke ramp systems to cater for upstands up to 450mm high
Nigeria - Lagos - Bilfinger Berger Central BankProvision of 2.9 m rolling platforms and ramp systems for Lagos central bank. LoadSwift undertook full design, development and shipment. The team attended the Lagos site to undertake training.
UK - Glasgow - Vinci Office BuildingLoadSwift system used on a redevelopment on a tight city centre site. Tower crane was removed early after completing structure 5 weeks early in a 20 week program as it was dedicated to concrete pour. Loads were lifted directly from transport in road speeding up loading. Reach allowed sidewalk access to be maintained during build.
UK - London - Skanska St BotulphsLoadSwift system used on 12 storey development. High volume of material including drywall packs lifted directly from transport. Originally planned to use 3 tower cranes, 2 were removed early and the building closed up to leave just one section for loading
UK - Oldham - Vinci Construction7 Storey Site with very difficult access and large amount of material to be moved. Crane gives up to 2 Tonnes at 11 metres
USA - Tampa Florida - Barton Malow St Josephs HospitalLoadSwift hoist and platforms used to move large amounts of material into a hospital extension. No room for tower crane on site. Project finished in 4 months compared to 6 planned